This molding process is similar in concept to green sand molding. The sand used in this process is a resin-coated sand in which a gas is used as a catalyst to start a chemical reaction that bonds the sand together producing a very hard and stable mold. After the metal is poured into the mold, it is broken up to reveal the casting.

Metals Poured:
Most castable metals.

Size Range:
This process usually produces parts under 30" square.

Tolerances:
+/- .020"/in

Draft Requirements:
1-4 Deg.

Minimum Section:

.150"

Normal Lead Time:
Tooling: 8-10 Weeks
Production: 6-10 Weeks

Description: Z:\metalsmarketing.com\media\1nobake.jpg

Hydraulic

Description: Z:\metalsmarketing.com\media\spacr.gif

Description: Z:\metalsmarketing.com\media\2nobake.jpg

Flow Meter Manifold

Description: Z:\metalsmarketing.com\media\spacr.gif

click browser
BACK button
to return